Caltrans Electrical Shop Project- Eureka, CA
Installed Capacity: 58.5200 kW- DC
First Year Electric Output (CSI Calculator): 63,623kwh
Summary:
Solex installed two sub-arrays on two roof tied to Satcon 50 PVS commercial inverter. Our ballasted racking system solution avoided extra penetrations in owner's pea-gravel roof system, thus maintaining its integrity. Surge protection devices on all solar circuits is provided. |
Caltrans District 09 Office Project- Bishop, CA
Installed Capacity: 89kW- AC
First Year Electric Output (CSI Calculator): 154,529kwh
Summary:
Design included a single ply roof membrane to match the existing system to maintain the roofing warranty. Solex installed two sub-arrays on two roof connected to Satcon 100 PVS commercial inverter. Veris weatherstation equipment and sub-array performance metering by Deck Monitoring was provided. Surge protection devices, weather station, and low-voltage monitoring circuits was provided.
|
Caltrans Equipment Shop Project- Marysville, CA
Installed Capacity: 108.1000 kW- DC
First Year Electric Output (CSI Calculator): 147,817kwh
Summary:
Solex installed two sub-arrays on two roof connected to Satcon 100 PVS commercial inverter. Veris weatherstation equipment and sub-array performance metering by Deck Monitoring was provided. Surge protection devices, weather station, and low-voltage monitoring circuits was provided. We leverage our construction experience in roofing and solar components, to create a work plan that saved 75% in installation costs on the cementatious asbestos roof panels. At owner's request, we engineered fused protection at ground level for convenient voltage testing and maintenance. |